Twitter site for regulatory actions up for public comment (Fair Shake ELS) |
PublicComment |
14-2322-EL-BGN PUCO; OPSB | Lordstown Energy Center (Lordstown Clean Energy Future) |
ERF (Ohio rule- filing site)U. S. EPA resources
JCARR (5-year rule review)
OSHA rules: GI; construction; FOM; tech. manual
CAA (Clean Air Act)
USC (United States (Statutory) Code) federal regulations current; historic
Federal Register
noticeandcomment.com
Ohio-related federal open dockets (all)
of particular interest:Ohio rule comment periods
n.b.: proposed/recent compressor stations here
open close Draft Control Techniques Guidelines (CTG) document for select oil and natural gas industry sources Dec. 4, 2015 Source Determination for Certain Emission Units in the Oil and Natural Gas Sector (relates to the adjacency question) Dec. 4, 2015 Oil and Natural Gas Sector: Emission Standards for New and Modified Sources Dec. 4, 2015 Appendix W modeling guidance revisions; docket Oct. 27, 2015 Updated Ozone Transport Modeling Data for the 2008 Ozone National Ambient Air Quality Standard Sept. 23, 2015 EA availability rev. Part 60 Subpart OOOO (on the Regulatory Actions page) EIS availability for Nexus/Texas Eastern NG pipeline projects May 22, 2015 up to 130,000 hp compression at four new NG turbine compressor stations in Columbiana, Medina, Sandusky and Lucas Counties PSD infrastructure requirements for SO2, NOX, ozone, lead - Direct Final Approval March 30, 2015 several entries that appear to be the same, for this and the proposed rule with same closing date - need to study further to discern distinction PSD infrastructure requirements for SO2, NOX, ozone, lead - Proposed Rule March 30, 2015 Ozone NAAQS March 17, 2015 Ohio comments and appendices scoping of environmental impact assessment for LeachXpress Pipeline Project February 12, 2015 new Summerfield and Oak Hill compressor stations in Noble and Jackson Counties, respectively; modified Crawford compressor station in Fairfield County. scoping of environmental impact assessment for Rover Pipeline Project Dec. 18, 2014 Paden City, W.Va. to Defiance, Ohio; ten new compressor stations, of which seven in Ohio, viz., Cadiz, Harrison Co.; Clarington, Monroe Co.; Seneca, Noble Co.; Defiance, Defiance Co.; Mainline 1, Carroll Co.; Mainline 2, Wayne Co.; Mainline 3, Crawford Co. Primary Aluminum NESHAPS; supplementary proposal signed Nov. 13 2014; not yet in FR as of Dec. 19, 2014; wait, those assholes did publish it, but failed to replace the page that says "this page will be replaced when the proposal is published;" comment period will be 45 days, i.e. ends Jan. 22, 2015 modeling files available Texas and Oklahoma visibility interesting discussion of modeling and regulatory background SO2 data collection 5/13/14 7/14/14 greenhouse gas permitting; comments; blog; background existing sources 12/1/14 OEPA comments. greenhouse gas permitting; comments; blog; background modified and reconstructed 10/16/14 (?) Ohio opacity rule 7/28/14 Ohio opacity rule reopening of comment period 8/8/14 9/8/14 Infrastructure requirements 7/25/14 8/25/14 Redesignation of Bellefontaine Area to Attainment of the 2008 lead standard 7/28/14 8/27/14 also 16026 docket number - can't tell how they differ. proposed approval; direct final PM 2.5 NSR review 11/28/14
Upcoming projects
draft
opendraft
closeproposed
openproposed
closeClermont Co./adjacent Ky. Co. SO2 redesignation request April 16, 2015 3745-18 sulphur dioxide (5yr review) March 17, 2015
(Early Stakeholder Outreach)fact sheet 3745-104 accidental releases (5yr review) Jan. 16, 2015 3745-114 toxic air contaminants (5yr review) ca. Jan. 2015 (??) (due 12/1/2011) 9/19/14 Nov. 28, 2014 Jan. 6, 2015 3745-111 ERC banking system (5yr review) Oct. 24, 2014 Nov. 24, 2014 "No change" proposed. 3745-104 accidental releases prevention program (5yr review) due 10/23/2014. Don't know why overdue. 3745-21 Carbon Monoxide, Photochemically Reactive Materials, Hydrocarbons, and Related Materials Standards Dec. 2, 2014 extensive changes
Ohio code
county company description dockets Lordstown Energy Trumbull 800 MW combined cycle gas turbine, 0278112009, A0052799; see also PUCO and OPSB dockets near top of this page Belmont Co. cracker plant Belmont PTT Global Chemical/Marubeni Appalachian Resins Monroe Colerain compressor station Belmont Ohio Pipeline Energy Network (OPEN); Texas Eastern Transmission compressors of combined 18,800 hp FERC; closed 9/22/14 Plasma compressor and pigging stations Monroe Ohio Valley Connector Project; Equitrans, L.P. 2 gas-driven centrifugal compressors of combined 21,000 hp; pig launch/receive facility FERC; closes 9/29/14 OAC Section 3745; DAPC
ORC Title 37
wage and hours
air pollution control
power siting pollution control
applicability determinationsinventories
RACT/BACT/LAER Clearinghouse (RBLC)
Emissions FactorsWebfire
AP-42Vol. 1, Ch. 3: Stationary Internal Combustion Sources
Speciation
NEIair quality
CAMD (capita.wustal.edu site)
EIS (OEPA)
TRI (OEPA)
Envirofacts (U.S. EPA)
NAAQS attainment (Ohio)toxicology
dispersion modeling
seamless server (topographic data)DAPC
geoid discussion (NAD27 vs. NAD83); conversion utility
Federal Land Managers (FLAG) manual
Appendix W and other modeling guidance; proposed changes
homepage
what's new
PTI applications
SIP submittals
engineering guides
EAC forms
terms and conditions library
Answer Place
eDocument search
The Law of Environmental Justice (extract)
Executive Order 12,898 (EPA site)
2005 GAO report
Washington Legal Foundation